Short answer

Most residential fences take one to three days on site. The time before that depends on steps outside the crew's control: HOA approval if you have one, the township permit review, and the PA One Call notice, which has to go in at least 3 business days before digging. Townships don't publish review times, so the honest answer is that the permit usually sets the start date, not the crew.

Row of freshly set wood fence posts with a taut string line across a backyard, before rails and boards go on
Row of freshly set wood fence posts with a taut string line across a backyard, before rails and boards go on. AI-generated illustration

The steps, in order

  1. Estimate and layout. We measure, find the lot lines as best we can, and check your municipality's rules for front yards, setbacks and height.
  2. Contract and design. You approve the material, height, gates and line. Lansdale Borough's application needs a copy of this contract, so the permit can't go in before it.
  3. HOA approval, if any. Montgomery Township's permit guidance says HOA rules apply, and Worcester's form asks for the HOA letter. Associations meet on their own schedules.
  4. Township permit. Filed with a site or plot plan. Upper Dublin takes it online; Lansdale and Towamencin take paper applications; Upper Gwynedd and Towamencin want two copies of the plot plan.
  5. PA One Call. The request goes in at least 3 business days before digging so utilities can mark their lines.
  6. Materials. Common styles are often in stock; special colors, tall gates or custom aluminum can take longer.
  7. Installation. Most residential fences take one to three days on site.

What makes the calendar stretch

FactorWhy it adds time
HOA reviewMust happen before the township application in many subdivisions
EasementsMontgomery Township needs a signed fence easement agreement; Towamencin needs written consent from the easement holder
Missing informationLansdale voids approval if easements or deed restrictions weren't disclosed; incomplete plot plans come back
Front-yard or corner-lot designsMore rules to check: gates in Upper Dublin and Worcester, sight triangles in Lansdale and Upper Gwynedd
PoolsThe barrier has to be planned with the pool permit; Towamencin wants permanent fencing in before the pool is filled
Weather and groundFrozen ground in deep winter and saturated soil in early spring slow digging

Why spring can be slow even with a permit in hand

Much of the North Penn area sits on red shale soils. Some, like the Croton series, have a dense layer 15 to 25 in down that holds water in late winter and early spring. Post holes in that ground fill with water, and concrete and gravel footings don't set the way they should in a flooded hole. We would rather wait a few dry days than set posts in mud.

How to keep your project moving

  • Find your survey or plot plan before the estimate.
  • If you have an HOA, request its fence guidelines and form right away.
  • Tell us about pools, hot tubs or dogs now; they change the gate and barrier details.
  • Mark sprinkler lines and invisible-fence wires. One Call doesn't mark private lines.
  • Clear the fence line of stored items, firewood and planters before install day.

During the install

Day one is usually layout and posts. On rocky shale lots, setting posts is the slowest part. Panels, pickets or mesh and gates follow. If posts are set in concrete, we let them cure before hanging heavy gates. When we finish, we walk the line with you and check every gate.

We will give you a realistic start window at the estimate, based on your township and whether an HOA is involved.

Common questions

Can I speed up the permit?

Complete applications move fastest. Missing dimensions, easements or HOA letters are the usual reasons a township sends one back.

Do I need to be home during the install?

Not the whole time, but someone should be there at the start to confirm the line and at the end to check the gates.

What if the utility marks land on my fence line?

We adjust post spacing to stay clear of marked lines, and we hand-dig near them.